Skip to main content
Menu

Category · Planning

Planning articles

Planning guidance for new builds, remodels, wiring, and technology decisions that are easier to get right early than late.

Open residential wall framing with organized low-voltage cable runs before drywall installation.

Featured · Planning

Low-Voltage Rough-In Checklist for a Custom Home

A pre-drywall checklist for device locations, AV, network, security, lighting controls, shade wiring, ceiling coordination, and documentation.

Read the article →

More in planning

Designated residential technology closet with structured cabling planned before drywall installation.
PlanningJuly 17, 2026

Where Should Smart Home Equipment Go? Planning the Technology Closet Before Drywall

Before drywall, ETG reviews the closet location, internet or fiber entry point, cable paths, airflow, power, and access so the system can be serviced later.

The Top 5 Things to Avoid When Building Your New Home
PlanningMarch 15, 2025

The Top 5 Things to Avoid When Building Your New Home

Five common mistakes during new-home construction, especially around low-voltage planning, infrastructure, and future-ready decisions.

Call ETGStart a project